Search results

From Synfig Studio :: Documentation
Jump to: navigation, search

Page title matches

Page text matches

  • *Open up the Zoom layer amount and connect LHS to PLANE_02_Z.
    11 KB (841 words) - 23:26, 1 January 2013
  • ...n the children lines up with which time in the Time Loop layer, giving the amount of the timeshift, with both positive and negative differences working as ex
    9 KB (1,408 words) - 17:00, 7 April 2020
  • | {{Shortcut|Control|Alt|(}} || Decrease {{l|Amount Parameter|Amount}} of selected layer | {{Shortcut|Control|Alt|)}} || Increase {{l|Amount Parameter|Amount}} of selected layer
    7 KB (1,077 words) - 17:34, 17 November 2015
  • Read {{l|Dev:Bline_Speed}} which explains about variations in the Amount parameter of Splines.
    3 KB (495 words) - 20:23, 1 April 2020
  • ...igin of the "arrow" layer is now defined by 3 sub parameters: a BLine, the amount to travel along the BLine, and a checkbox that we'll ignore for now. ...w will move so that it is about half-way along the BLine path (because the Amount sub-parameter defaults to 0.5).
    8 KB (1,360 words) - 14:38, 2 January 2015
  • ||{{l|Image:Type_real_icon.png|16px}} {{l|Amount Parameter|Amount}}
    7 KB (1,095 words) - 20:10, 8 April 2020
  • Sets the {{l|Amount Parameter}} for new layers. Defaults to 1.00 (Completely opaque)
    3 KB (450 words) - 13:45, 10 October 2016
  • 30 bytes (3 words) - 20:44, 4 February 2013
  • {{Title|Amount}}
    471 bytes (70 words) - 14:57, 15 March 2017
  • ...and animate all those layers together (for instance, change all their {{l|Amount Parameter|amounts}}, or move their {{l|Origin Parameter|origins}}).
    6 KB (1,108 words) - 12:38, 8 November 2018
  • | Amount | Amount
    22 KB (3,214 words) - 06:05, 6 January 2016
  • Détermine le {{l|Amount Parameter|paramètre quantité}} pour les nouveaux calques. Par défaut à
    3 KB (430 words) - 13:08, 4 October 2015
  • ||{{l|Image:Real_icon.png|16px}} {{l|Amount Parameter|Amount}}
    5 KB (873 words) - 01:08, 15 September 2016
  • ||{{l|Image:Type_real_icon.png|16px}} {{l|Amount Parameter|Kolik bude…}}
    2 KB (308 words) - 22:14, 15 March 2017
  • ...of the Origin produces two effects. It drags the resulting vector the same amount of the Origin along the time (that is the resulting vector is the sum of th ...h a width of '''0.5''', meaning it is used backwards and forwards the same amount:
    45 KB (6,911 words) - 22:52, 13 September 2016
  • ||{{l|Image:Type_real_icon.png|16px}} {{l|Amount Parameter|Amount}}
    8 KB (1,241 words) - 04:01, 7 January 2020
  • ...then the edge of the shape becomes dissolved and spread out and shrunk the amount that the Feather value indicates. ...n Layer}} and {{l|Star Layer}}. All the example images below have the same amount of Feather (set to 20 points).
    2 KB (352 words) - 11:58, 23 May 2014
  • * amount - this uses the ValueNode called "{{l|Tracking Curves#Spline Parameter|spli ** Amount - this re-uses the ValueNode called "{{l|Tracking Curves#Spline Parameter|s
    11 KB (1,762 words) - 16:45, 2 January 2015
  • ||{{l|Image:Type_real_icon.png|16px}} {{l|Amount Parameter|Amount}}
    3 KB (453 words) - 14:20, 26 February 2017
  • ||{{l|Image:Real_icon.png|16px}} {{l|Amount Parameter|Amount}}
    3 KB (468 words) - 20:47, 26 April 2020

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)